Plumbing
by
, 08-29-2011 at 07:38 AM (1433 Views)
Plumbing finsihed for the drains:
Returns will be over the top from the right side of the tank and will be made later on.
2 x 1.5" drains (one for backup)
1x 1 inch drain supplying fuge and water change tank.
Side view of the external overflow and plumbing to sump
Stand view
Still have to continue the plumbing to the water change tank when its done.