Today was a busy day - made some progress
by
, 09-28-2010 at 11:35 PM (8836 Views)
I woke up today excited to receive my pallet from Premium Aquatics. It arrived 2.5 hours later than promised, which delayed my other project but what could I do about that? The pallet has Tropic Eden sand, both dry and many trays of live sand for the new tank. Two bags of calcium reactor media by Tropic Eden (large reef 'bones' type), Sybon reef salt, filter socks, Vertex NP pellets, bulkheads, Phosphate Control, thermometers and more. The driver had to make two trips up the driveway with his pallet jack to get this in the garage.
After he left, Bobby and I drove up to Home Depot to pick up the copper pipe needed to relocate the water heater. We had to head over to Lowes to get a few things that HD didn't have in stock, and then he began to work on the fittings. Sorry this picture didn't come out too well, but you can see how he started putting elbows on each fitting.
While he worked on that, I pulled out the sheetrock & insulation from the walls that are coming down. Wiring was removed, including the 220v lead that had to be moved over to where the water heater would finally go.
It took until dark, but the water heater is hooked up and the house has running water again.
There is still plenty to do tomorrow. I need to get the forms up, the rebar in place, the old walls out of the way, and add more plumbing for the utility sink. Thursday, I'll pour the concrete. I still have to figure out if a french drain is possible, as the flooring isn't as deep as is needed for the kind sold at the hardware store. I may end up fabricating my own. The floor is 3" at the kitchen end, and drops down to 4" at the 12' mark where the room ends.