View RSS Feed

75 gallon tank

Transportaion engineers and plumbing...oh my - AKA plumbing part II

Rate this Entry
Well, I planned my work and worked my plan...until my brain got in the way, then I revised my plan and made things way more complicated.
Anyway, the plumbing is done...mostly.

How we got there:

Time to plumb a pump.

I started with a 3/4" to 1 1/2" adaptor threaded to a 1 1/2" union. I screwed these 2 fittings together prior to putting them on the pump to avoid cracking the pump housing.
Click image for larger version

Name:	IMAG0091.jpg
Views:	1169
Size:	53.1 KB
ID:	7049

Then I screwed this assembly on to the pump.
Click image for larger version

Name:	IMAG0092.jpg
Views:	321
Size:	63.6 KB
ID:	7050

Next I screwed a 1 1/2" thread to slip fit adaptor to the top of the union. Here's the finished assembly (from an earlier photo).
Click image for larger version

Name:	IMAG0058.jpg
Views:	299
Size:	66.4 KB
ID:	7051

Next I built the manifold. This will split the flow from the Mag12 between feeding my biopellet reactor, charcoal reactor and return flow with the option to bleed off extra flow to the cheato section in the sump.

First I got all the parts laid out with short pieces of pipe cut for joining all the fittings together.
Click image for larger version

Name:	IMAG0094.jpg
Views:	303
Size:	57.9 KB
ID:	7052

Then I glued the pieces for the 1/2" and 3/4" reactor feed sections together and glued those to the reducer tees. Then I carefully lined up the reducer tees so they would be level when glued to the 1 1/2" tee which would split the flow between the return and the manifold. I did this dry first and put marks on the fittings so that I would have a way to line them up quickly when I was glueing the pieces together.
Click image for larger version

Name:	IMAG0095.jpg
Views:	292
Size:	78.6 KB
ID:	7053

Click image for larger version

Name:	IMAG0096.jpg
Views:	321
Size:	59.8 KB
ID:	7054

Then I glued up the rest of the fittings. I took the double union ball valve apart prior to gluing all the fittings together to avoid getting glue in the ball valves.
Click image for larger version

Name:	IMAG0097.jpg
Views:	313
Size:	56.9 KB
ID:	7055
Click image for larger version

Name:	IMAG0098.jpg
Views:	300
Size:	58.3 KB
ID:	7056

Next I measured, cut and glued the upright from the top of the pump to the manifold. Then I glued a 45 degree bend to the top part of the 1 1/2" tee going up to the return and glued another union to the 45. A short piece of spa flex to keep pump vibrations from being transferred into the main tank via the return plumbing and another 45 completed the manifold. Then I measured and cut the pipe to get the return to the top of the tank. (2) 90 degree bends finished out the return. I still need to add a short piece of pipe and another 90 to direct the return.
Sorry, not alot of pictures for this process, just one of the completed return and manifold.
Click image for larger version

Name:	IMAG0101.jpg
Views:	305
Size:	75.5 KB
ID:	7057

To finish out the second overflow pipe, I glued a wye onto the bottom of the overflow pipe, added a 45 to the bottom and finished it off with spa flex to get into the skimmer section. Then I added a 22.5 bend to the wye and glued on a slip fit to thread adaptor.
Click image for larger version

Name:	IMAG0099.jpg
Views:	323
Size:	56.3 KB
ID:	7058

Last step was to add spa flex into the cheato section.

Here's the mostly finished product. I also still need to use some alcohol to clean up the excess glue per Midnight's previous suggestion. (Going to try that now.)
Click image for larger version

Name:	IMAG0102.jpg
Views:	294
Size:	82.5 KB
ID:	7059
Click image for larger version

Name:	IMAG0103.jpg
Views:	302
Size:	90.1 KB
ID:	7060

The spa flex going from the wye to the cheato section is connectd via a threaded conneciton. This was an after thought that may have been unnecessary and certainly added some extra time and complexity to the project. The idea is to make sure there's enough flow going to the cheato section. If the Mag12 isn't strong enough to provide 400 gph to the tank, 350 gph to the biopellet reactor, 200 gph to the carbon reactor and around 100 gph to the cheato section. My original design didn't include this option, but it was easier to plumb it in now and not need it, than to need it and have to plumb it in later. If I don't need it, there's too much flow to the cheato section or not enough to the skimmer section (don't know that any of these are a real posssibility) then I can unscrew the spa flex and screw in a threaded plug.

The one thing that became obvious after I got the plumbing installed is that I'll need to have the baffle closest to the skimmer cut higher in the back forming a rectangular weir in the front. This will prevent water from flowing directly between the overflows and the return pump and force it to move toward the front of the tank so it can be skimmed prior to being returned to the pump.

With my target being 400 gph through the sump and a 6" wide weir, the flow over the top of the weir will be around 1/2" high.

Maybe it'll all be clearer once I get the baffles ordered and have some pictures.

Anyway, sorry this post was short on pictures, thanks for following along, and as always all comments are welcome.

Submit "Transportaion engineers and plumbing...oh my - AKA plumbing part II" to Digg Submit "Transportaion engineers and plumbing...oh my - AKA plumbing part II" to del.icio.us Submit "Transportaion engineers and plumbing...oh my - AKA plumbing part II" to StumbleUpon Submit "Transportaion engineers and plumbing...oh my - AKA plumbing part II" to Google

Updated 02-19-2012 at 09:09 PM by blakew (Added an additional thought.)

Categories
Tank Entry , ‎ Plumbing , ‎ DIY projects

Comments

  1. melev's Avatar
    Everything looks good, except for one area and it's something I didn't include in my plumbing write up unfortunately. Wye fittings are usually designed for vent pipe applications, and they don't have much of a socket for the gluing process. All your other fittings were 1" to 1.5" deep but a "Y" fitting is 3/4" at best. With less surface area, the glued connection must be perfectly seated and glued meticulously. It is a weak spot.

    I'm not saying yours will fail, but there are Y fittings with deep sockets, usually ordered online. The local stores rarely carry them.
  2. Midnight's Avatar
    Blake I don't care what Marc says I think you did a good job <chuckle>
  3. baker.shawn's Avatar
    great work!
    i plan on doing something similar with my extra mag 5 after the move
  4. blakew's Avatar
    @ melev - To be honest, there's two areas I'm concerned with (1) the wye for the reasons you mentioned (2) the connections between schedule 40 and spa flex (especially on the pressure side). That being said, I needed both to accomplish my "master plan" (hopefully not a bit of over engineering that bites me in the backside).

    @ Midnight - Thanks, fingers crossed

    @ baker.shawn - Depending on the size of your reactors, my research indicated a flow of around 300 - 350 gph for biopellets and around 200 gph for charcoal so to borrow a phrase from Midnight, you'll need to plumb carefully.
  5. blakew's Avatar
    Off topic...melev you must not sleep much...up until 1:30 or 2 taking pics of your spawning sun coral and then back up at 5:20. I might have gotten away with that in my younger days, but now I'd be worthless with only 3 1/2 - 4 hours sleep.
  6. melev's Avatar
    I was still up, actually. hehe I went to bed thereafter and then got up before noon. Coral spawning is like a rave event - you can't miss it.
  7. blakew's Avatar
    Oh yeah...witnessing an event like that, especially in ones own tank, must be an awesome event.