Electrical
by
, 12-24-2011 at 01:04 PM (2180 Views)
Started with the electricalboard and power outlets. Had to go back to initial pictures to locate where plumbing and vent tubing passes in the wall as it's close to where I had to drill. Marked those with Masking tape on the wall so I don't drill even close.
Installed a wood pannel on the wall which will make it easier to fix things instead of drilling in the wall each time as well as act as a sound absorber as I'm struggling with Echo inside the cabinets when I tried the vortech...
1st to go in are 3 Coralvue dimmable ballasts to go with the Lumenbrights.
This was more complex than usual as I'll have 4 electrical supply lines to the tank
-2 Mains +B/U generator
-1 Mains only
- 1 Mains +B/U Generator + Tank dedicated UPS
Supply lines:
Beginning stage of 3 painfull days of electrical work:
And the final product
Still have to add a couple of timers when I finalize the Suppemental T5 lights and how they'll run... as well as some voltage and Amps tracking boards...