T-4 days until the glass arrives
by
, 11-22-2010 at 01:53 PM (1297 Views)
So its another nasty cold winter day here in town, we have some beautiful blowing snow, and some -30 weather. We kept busy, and warm, this past weekend by making one last trip to the dump, cleaning up the floor, getting all of our insulation into the tank room, and getting our blue board up. I also realized this morning that I forgot to buy a door for the tank room. I to buy one sooner rather then later I think.
The glass arrives on Friday, it will just be the tank glass for now. I opted to hold back on the sump until I'm 100% ok with the layout of pumps. This stems from a little oops with the leg tank/waterchange system. I forgot to leave enough space for the pump, and Ocean Runner 600, so now I have a bit of a connundrum to solve. I'm worried it will happen with the sump as well, so I need to re-assure myself about pump and plumbing placement before I go ahead with it.
So some photos:
Mostly clean display side of the basement
The stand is now a table top to do some the work above it.
Plywood is in, just have to add a layer of foam and then the tank!
Moved the offsets that were in the way; before
after;
Blue board is mostly up, I wanted the stuff up behind the tank wall ASAP, just in case I couldn't get the rest done in time.
Leg tank is all drywalled and the backside is now mudded
View from the backside of the tank into what will eventually be our media room